A recently conducted pilot study on Flood Early Warning System in Hydropower shows that installation of an Early Warning System (EWS) prevents loss of life, property and destruction of hydropower projects in Nepal. With funding from Tayar Project of USAID, Urja Engineering And Management Solutions and Independent Power Producers’ Association Nepal (IPPAN) in a close collaboration with Local Levels and communities in Mai Beni Hydropower Project, the study conducted in the area show that EWS is a prerequisite of river basin given the current extreme weather pattern
By A Correspondent Mar 27, 2022
With his announcement, learn to live with virus, Boris Johnson has scrapped Covid restrictions showing the way for other countries as well. Badly affected by lockdown and other precautionary measures, Nepal also needs to take such measures to push the economic activities.
By A Correspondent Mar 07, 2022